Arroyo Solar
ERCOT queue ID 20INR0086
Arroyo Solar (20INR0086) is listed in the ERCOT interconnection queue as a 100 MW solar project in Cameron County, TX. The filing names Tap # Rio Hondo - # La Palma as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, IA”, with a target commercial operation date of February 22, 2028. It records the screening study as complete on July 9, 2018 and the interconnection agreement as signed on September 28, 2021.
| Queue ID | 20INR0086 |
|---|---|
| Project name | Arroyo Solar |
| Status (as published) | SS Completed, FIS Started, IA |
| Substation | Tap # Rio Hondo - # La Palma |
| Point of interconnection | 345 KV Tap #8318 Rio Hondo - #8317 La Palma |
| County | Cameron |
| State | TX |
| Voltage | 345 kV |
| Capacity | 100 MW |
| Resource (as published) | SOL/PV |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2028-02-22 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Cameron, TX: 32 requests in the ERCOT queue, 30 active totaling 8,649.9 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | BT Cantwell Solar, LLC |
|---|---|
| CDR reporting zone | COASTAL |
| Fuel code | SOL |
| Technology code | PV |
| Interconnection agreement signed | 2021-09-28 |
| Screening study complete | 2018-07-09 |
| Air permit | Not Required |
| Water availability | Not Required |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.