Arroyo Solar

ERCOT queue ID 20INR0086

Arroyo Solar (20INR0086) is listed in the ERCOT interconnection queue as a 100 MW solar project in Cameron County, TX. The filing names Tap # Rio Hondo - # La Palma as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, IA”, with a target commercial operation date of February 22, 2028. It records the screening study as complete on July 9, 2018 and the interconnection agreement as signed on September 28, 2021.

Queue ID20INR0086
Project nameArroyo Solar
Status (as published)SS Completed, FIS Started, IA
SubstationTap # Rio Hondo - # La Palma
Point of interconnection345 KV Tap #8318 Rio Hondo - #8317 La Palma
CountyCameron
StateTX
Voltage345 kV
Capacity100 MW
Resource (as published)SOL/PV
Resource categorySolar (normalized for filtering)
Target commercial operation2028-02-22
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Cameron, TX: 32 requests in the ERCOT queue, 30 active totaling 8,649.9 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityBT Cantwell Solar, LLC
CDR reporting zoneCOASTAL
Fuel codeSOL
Technology codePV
Interconnection agreement signed2021-09-28
Screening study complete2018-07-09
Air permitNot Required
Water availabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.