Burro Loco Energy Storage

ERCOT queue ID 24INR0319

Burro Loco Energy Storage (24INR0319) is listed in the ERCOT interconnection queue as a 25.1 MW battery project in Cameron County, TX. The filing names Resaca as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of September 15, 2028. It records the screening study as complete on October 14, 2022.

Queue ID24INR0319
Project nameBurro Loco Energy Storage
Status (as published)SS Completed, FIS Started, No IA
SubstationResaca
Point of interconnection8626 Resaca 69kV
CountyCameron
StateTX
Voltage69 kV
Capacity25.1 MW
Resource (as published)OTH/BA
Resource categoryBattery (normalized for filtering)
Target commercial operation2028-09-15
Source datasetlarge

In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.

Same substation and county

Cameron, TX: 32 requests in the ERCOT queue, 30 active totaling 8,649.9 MW.

Tracked changes

No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →

Additional filed fields

Interconnecting entityVESI
CDR reporting zoneCOASTAL
Fuel codeOTH
Technology codeBA
Screening study complete2022-10-14
Air permitNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.