Harper Energy Storage
ERCOT queue ID 22INR0469
Harper Energy Storage (22INR0469) is listed in the ERCOT interconnection queue as a 82.4 MW battery project in Cameron County, TX. The filing names Tap La Palma - Villa Cavazos as its point of interconnection. ERCOT lists its status as “SS Completed, FIS Started, No IA”, with a target commercial operation date of September 15, 2028. It records the screening study as complete on March 1, 2022.
| Queue ID | 22INR0469 |
|---|---|
| Project name | Harper Energy Storage |
| Status (as published) | SS Completed, FIS Started, No IA |
| Substation | Tap La Palma - Villa Cavazos |
| Point of interconnection | Tap 138kV 8314 La Palma - 80229 Villa Cavazos |
| County | Cameron |
| State | TX |
| Voltage | 138 kV |
| Capacity | 82.4 MW |
| Resource (as published) | OTH/BA |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2028-09-15 |
| Source dataset | large |
In ERCOT's status codes, SS is the screening study, FIS the full interconnection study and IA the interconnection agreement.
Same substation and county
Cameron, TX: 32 requests in the ERCOT queue, 30 active totaling 8,649.9 MW.
Tracked changes
No changes to this filing observed since ERCOT tracking began on August 27, 2026. Full change log →
Additional filed fields
| Interconnecting entity | VESI 31 LLC |
|---|---|
| CDR reporting zone | COASTAL |
| Fuel code | OTH |
| Technology code | BA |
| Screening study complete | 2022-03-01 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.