ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
Brandon Shores Deactivation Project Updates: Summary of Cost Changes
b3780.1
Not printed 1513.96 12/31/2028 Not printed 2025-02-04
TEAC
2022 Window 3 Upgrades Additional Scope Replace Terminal Equipment at Rock Springs 500 kV
B3800.55
Not printed $1.37M 3/31/2027 Not printed 2026-03-10
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate
prior value printed on the same page
738.83 → 1513.96 2025-02-04 2025-02-04

Every mention

DateDocumentProjectWhat the document says about it
2026-03-10 TEAC
Item 11 - Reliability Analysis Update p. 10
2022 Window 3 Upgrades Additional Scope Replace Terminal Equipment at Rock Springs 500 kV No role wording
2025-02-04 TEAC
Item 12 - Reliability Analysis Update p. 13
Brandon Shores Deactivation Project Updates: Summary of Cost Changes No role wording
500 kV