Substation Scout

Bramah/North Delta

Named in 1 PJM planning document for 1 project, on March 10, 2026.

Newdescribed as
PJM system-widezone
500 kVkV as printed
1mentions

Described as new: “Transource proposed Bramah/North Delta 500 kV substation” — source, page 10

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
2022 Window 3 Upgrades Additional Scope Replace Terminal Equipment at Rock Springs 500 kV
B3800.55
Not printed $1.37M 3/31/2027 Not printed 2026-03-10
TEAC

Every mention

DateDocumentProjectWhat the document says about it
2026-03-10 TEAC
Item 11 - Reliability Analysis Update p. 10
2022 Window 3 Upgrades Additional Scope Replace Terminal Equipment at Rock Springs 500 kV “Transource proposed Bramah/North Delta 500 kV substation”
500 kV

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.

Before relying on any of this