Brandon Shores deactivation upgrades
Brandon Shores Deactivation Project. Presented by PJM in PJM planning materials (BGE zone).
Profile
PJM Transmission Planning told PJM's Transmission Expansion Advisory Committee on February 4, 2025 that the estimated cost of the Brandon Shores deactivation upgrades had changed from $738.83 million to $1,513.96 million, an increase of $775.13 million. (p. 1, p. 13, p. 15) PJM's planning case for 2028 removes the Brandon Shores generators as per their deactivation notice, and the upgrades were approved under a Brandon Shores Deactivation Immediate Need. (p. 13, p. 20) The largest increases in the cost table are the Brighton STATCOM and capacitor ($63 million to $229 million), the Graceton 500 kV expansion ($82 million to $213.2 million) and the Solley Road substation and STATCOM ($109 million to $239.6 million). (p. 13) The drivers Exelon lists include vendor quotes above the earlier budgetary quotes, a change of the new Batavia substation from air insulated to gas insulated because of space constraints and wetland conditions, and higher construction and engineering labor rates. (p. 14) The February 2025 deck projects an in-service date of December 31, 2028 against a required date of June 1, 2025; the December 5, 2023 deck had projected 2026-2028. (p. 1, p. 15, p. 1, p. 21) In December 2023 PJM recommended canceling a planned 500/230 kV West Cooper substation, estimated at $60 million, and the 2025 table lists it as canceled and replaced with the new Bramah (North Delta) 500/230 kV substation. (p. 1, p. 20, p. 1, p. 15)
Written by Scout, Substation Scout's research agent, from the cited pages only, and checked by script: every quote must be on its page and every number in this profile must appear in a cited quote. Reviewed November 27, 2026.
What the plan includes
| Component | As printed | Source |
|---|---|---|
| Peach Bottom North substation work (b3780.1) | PECO; $33 M original, $76.63 M updated | p. 13 |
| Peach Bottom - Graceton 500 kV line (PECO) (b3780.2) | New 500 kV line, PECO; $48 M original, $63.74 M updated | p. 13 |
| West Cooper substation (b3780.3) | Canceled | p. 13 |
| Peach Bottom - Graceton (BGE) (b3780.4) | BGE; $17 M original, $38.8 M updated | p. 13 |
| Solley Road substation + STATCOM (b3780.5) | Build substation + STATCOM, BGE; $109 M original, $239.6 M updated | p. 13 |
| Granite substation + STATCOM (b3780.6) | Build substation + STATCOM, BGE; $91 M original, $198.6 M updated | p. 13 |
| Batavia Road substation (b3780.7) | Build substation, BGE; $36 M original, $127.8 M updated | p. 13 |
| Graceton 500 kV expansion (b3780.8) | 3 breaker bays, 2 autotransformers, capacitors, BGE; $82 M original, $213.2 M updated | p. 13 |
| Graceton - Batavia Road 230 kV line (b3780.9) | Double circuit, BGE; $195 M original, $207.2 M updated | p. 13 |
| Conastone capacitor (b3780.10) | BGE; $15 M original, $33.7 M updated | p. 13 |
| Brighton STATCOM and capacitor (b3780.11) | PEPCO; $63 M original, $229 M updated | p. 13 |
| Burchess Hill capacitor (b3780.12) | PEPCO; $15 M original, $12 M updated | p. 13 |
| Batavia Road - Riverside 230 kV reconductor (b3780.13) | BGE; $21 M original, $57.3 M updated | p. 13 |
| Cooper - Bramah 230 kV line (b3780.14) | New Cooper-Bramah 230 kV line, PECO; $3.6 M original, $6.73 M updated | p. 13 |
| 5012 line cut-in at Bramah (PECO) (b3780.15) | PECO; $7.86 M original, $7.29 M updated | p. 13 |
| Cooper - Bramah 230 kV termination at Bramah (b3780.16) | Transource; $0.47 M, unchanged | p. 13 |
| 5012 line cut-in at Bramah (Transource) (b3780.17) | Transource; $1.1 M, unchanged | p. 13 |
| Doubs transformer 3 line drops (b3781) | APS; $0.8 M, unchanged | p. 13 |
Details as printed
| Meeting | Transmission Expansion Advisory Committee, February 4, 2025 | p. 1 |
|---|---|---|
| Cost original | $738.83 million (original estimate) | p. 13 |
| Cost change | $775.13 million increase | p. 13 |
| Required in service | 6/1/2025 (required) | p. 15 |
| Driver | PJM's 2028 base case removes the Brandon Shores generators as per the deactivation notice | p. 13 |
| Immediate need | Approved under the Brandon Shores Deactivation Immediate Need | p. 20 |
| Meeting 2023 | Transmission Expansion Advisory Committee, December 5, 2023 | p. 1 |
| Schedule 2023 | Required June 2025; projected 2026-2028 | p. 21 |
| West cooper cancel | PJM recommended canceling B3780.3, the 500/230 kV West Cooper substation, estimated at $60M | p. 20 |
| West cooper replaced | West Cooper canceled, replaced with the new Bramah (North Delta) 500/230 kV substation (Transource B3737.47) | p. 15 |
| Cost driver quotes | Vendor quotes for long lead equipment came in above earlier budgetary quotes | p. 14 |
| Cost driver batavia | New Batavia substation changed from air insulated to gas insulated, due to space constraints and wetland conditions | p. 14 |
| Cost driver labor | Construction and engineering labor rates have increased | p. 14 |
History in PJM materials
Every PJM document that presented a part of this project, oldest first, with the cost and date printed in it. Values are shown only where they passed the check against the PDF text.
| Meeting | Document | Title as printed | Cost | In service | Status / stage |
|---|---|---|---|---|---|
| December 5, 2023 | Item 15 - Reliability Analysis Update 2022 Window 3 | PJM recommended adjustments to Earlier Approved Brandon Shores De-Activation Scope | $60M | 2026-2028 | |
| February 4, 2025 | Item 12 - Reliability Analysis Update PDF | Brandon Shores Deactivation Project Updates: Summary of Cost Changes | 1513.96 | 12/31/2028 |
Substations in the PJM rows for this project
Every station named in the PJM planning rows tracked for this project, with its utility zone. Where a row is a whole proposal package, this includes stations in other parts of that package. Each links to its Substation Expansion Tracker page.
- Batavia Rd. (BGE): described as new
- Batavia Road (PJM system-wide): described as new
- Graceton (BGE): described as new
- Granite (PJM system-wide): described as new
- North Delta (PJM system-wide): described as new
- Peach Bottom North (BGE): described as new
- Peach Bottom South (PJM system-wide): described as new
- Solley Road (PJM system-wide): described as new
- West Cooper (BGE): described as new
- Bramah (PJM system-wide)
- Brighton (BGE)
- Brighton (PJM system-wide)
- Burchess Hill (BGE)
- Burchess Hill (PJM system-wide)
- Conastone (BGE)
- Conastone (PJM system-wide)
- Cooper (PJM system-wide)
- Delta/Calpine (BGE)
- Doubs (PJM system-wide)
- Graceton (PJM system-wide)
- Granite (BGE)
- North Delta (BGE)
- Northeast (BGE)
- Peach Bottom (BGE): expansion described
- Peach Bottom (PJM system-wide)
- Peach Bottom North (PJM system-wide)
- Riverside (BGE)
- Riverside (PJM system-wide)
- Solley (BGE)
- West Cooper (PJM system-wide)
In the news
Third-party coverage, listed for reference. Substation Scout does not verify what these articles report.
- Maryland officials press FERC to reject PJM directive to Exelon for $785M in transmission upgrades, Utility Dive, September 20, 2023. Utility Dive reported that the Maryland Public Service Commission and Office of People's Counsel asked FERC to reject PJM's directive that Exelon utilities build $785 million in upgrades tied to the Brandon Shores closure, arguing PJM had not considered alternatives such as storage or a reliability-must-run contract, while PJM said no mature technology could replace the needed transmission.
- Talen, PJM Reach Agreement to Keep 2 GW of Coal, Oil Generation Online for Reliability in Maryland, POWER, January 29, 2025. POWER reported that Talen, PJM, Maryland regulators, utilities, consumer representatives and the Sierra Club reached a settlement, subject to FERC approval, to keep Brandon Shores and the H.A. Wagner units running under a reliability-must-run contract until May 31, 2029, with PJM citing voltage and thermal problems if the plants retired before the transmission upgrades are completed in 2028.
- Regulators green-light power line upgrades needed to close last Maryland coal plant, The Baltimore Banner, August 7, 2026. The Baltimore Banner reported that the Maryland Public Service Commission gave final approval to BGE's transmission line from Brandon Shores to the Pennsylvania border, part of a project now estimated at $1.5 billion, that an extension keeps the plant online until 2031, and that a utility law judge's filing projected an average increase of $2 to $4 on BGE customers' monthly bills.
Not printed
- Neither deck prints a state for the program or its components; no state is listed.
- No county is printed for Solley Road, Granite, Batavia Road or Bramah.
- The February 2025 deck prints one projected in-service date and one cost for the whole program; it does not print a status or date per component.
- The December 2023 deck does not print a program total.
- The PJM decks do not discuss the Brandon Shores plant's own operation while the upgrades are built.
Costs and dates are the presenting utility's or PJM's estimates as printed, not a forecast. A project can change scope, cost or schedule at any later meeting.