Rock Springs

Named in 1 PJM planning document for 1 project, on March 10, 2026.

Existingdescribed as
PJM system-widezone
500 kVkV as printed
1mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
2022 Window 3 Upgrades Additional Scope Replace Terminal Equipment at Rock Springs 500 kV
B3800.55
Not printed $1.37M 3/31/2027 Not printed 2026-03-10
TEAC

Every mention

DateDocumentProjectWhat the document says about it
2026-03-10 TEAC
Item 11 - Reliability Analysis Update p. 10
2022 Window 3 Upgrades Additional Scope Replace Terminal Equipment at Rock Springs 500 kV “Replace terminal equipment at Rock Springs 500 kV”
500 kV