Conastone

Named in 2 PJM planning documents for 2 projects, from February 4, 2025 to October 6, 2026.

Existingdescribed as
PJM system-widezone
—kV as printed
2mentions

Projects naming this substation

Figures are from the most recent document naming each project, as printed. Each links to its page.

ProjectStatus as printedCost estimateIn-service dateCustomer loadAs of
RTEP 2022 Window #1 Projects Summary of Cost Changes
b3771
Not printed 136.2 Not printed Not printed 2026-10-06
TEAC
Brandon Shores Deactivation Project Updates: Summary of Cost Changes
b3780.1
Not printed 1513.96 12/31/2028 Not printed 2025-02-04
TEAC

Changes between documents

Where two documents print different values for the same project. A large change in a cost estimate can reflect a need being combined with others into one solution, not only a re-estimate; read both pages.

What changedPrinted valuesEarlierLater
Cost estimate
prior value printed on the same page
37.76 → 136.2 2026-10-06 2026-10-06
Cost estimate
prior value printed on the same page
738.83 → 1513.96 2025-02-04 2025-02-04

Every mention

DateDocumentProjectWhat the document says about it
2026-10-06 TEAC
Item 16 - Reliability Analysis Update - Presentation p. 17
RTEP 2022 Window #1 Projects Summary of Cost Changes No role wording
2025-02-04 TEAC
Item 12 - Reliability Analysis Update p. 13
Brandon Shores Deactivation Project Updates: Summary of Cost Changes “Install new Conastone capacitor”

* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.