Cheltanham
Named in 1 PJM planning document for 1 project, on December 5, 2023.
Not stateddescribed as
PJM system-widezone
500 kVkV as printed
1mentions
Projects naming this substation
Figures are from the most recent document naming each project, as printed. Each links to its page.
Part of a named transmission project: Bramah–High Ridge 500 kV ($708.77M).
| Project | Status as printed | Cost estimate | In-service date | Customer load | As of |
|---|---|---|---|---|---|
| Recommended Solutions to Address Clusters - East B3800.26 –B3800.51 |
Not printed | $708.77 M | 2028-2030 | Not printed | 2023-12-05 TEAC |
Other substations in this project
“Recommended Solutions to Address Clusters - East” also names 13 other substations, with what the most recent document says about each.
- Brighton PJM system-wide Work described at it — “Replace terminal equipment at both Brighton and Waugh Chapel” (p. 53)
- Chalk Point PJM system-wide Work described at it — “Replace relay at Chalk Point 500 kV” (p. 55)
- Conastone PJM system-wide Work described at it — “Upgrade (2) existing 500 kV breakers at Conastone” (p. 54)
- Gracetone PJM system-wide Not stated
- High Ridge PJM system-wide New — “Build High Ridge 500 kV substation” (p. 52)
- Hope Creek PJM system-wide Not stated
- North Delta PJM system-wide New — “North Delta 500 kV termination for the Rock Springs 500 kV line” (p. 52)
- Peach Bottom PJM system-wide Work described at it — “Peach Bottom 500 kV – Reconfigure and upgrade several terminal/substation equipment at both North and South Peach Bottom 500 kV substations” (p. 52)
- Peach Bottom North PJM system-wide Work described at it — “upgrade several terminal/substation equipment at both North and South Peach Bottom 500 kV substations” (p. 56)
- Peach Bottom South PJM system-wide New — “Build new Peach Bottom South - North Delta 500kV line” (p. 52)
- Red Lion PJM system-wide Work described at it — “Replace terminal equipment at Red Lion” (p. 56)
- Rock Springs PJM system-wide Work described at it
- Waugh Chapel PJM system-wide Work described at it — “Replace terminal equipment at both Brighton and Waugh Chapel” (p. 53)
Every mention
| Date | Document | Project | What the document says about it |
|---|---|---|---|
| 2023-12-05 | TEAC Item 15 - Reliability Analysis Update 2022 Window 3 p. 55 |
Recommended Solutions to Address Clusters - East | No role wording 500 kV |
* A local-plan posting carries no meeting date; the date shown is when pjm.com last modified the file.
Before relying on any of this
- Names are machine-extracted from PDFs by a language model. Every exported name was checked to be printed in the PDF text; names read only from maps or diagrams are excluded.
- An entry is a name within a transmission zone, not a verified physical facility. The same name in two zones is two entries; spelling variants are merged only when they differ by punctuation, case or a generic suffix such as "Substation", or when a PJM document prints a rename for the same project (src/ingest/rtepAliases.json; the entry lists its old names).
- role is "new" only where a cited document phrase calls the substation new, describes constructing it, or calls it proposed (graded by src/lib/roleBasis.js), "existing" where a phrase describes work at it, otherwise "unknown".
- expansion is set on a substation that is not "new" where a cited phrase describes a new voltage level, a new or expanded yard, bus or bay, or a named load connected to it (graded by src/lib/expansionBasis.js). It reproduces what the document describes and adds nothing to it.
- Costs, dates, statuses and loads are the documents' own printed values for the most recent document that names the substation. Each one shipped here is printed on its cited page ("verification": "exact" or "on-page"); values that failed that check are withheld and counted in figures_withheld_unverified. None has been reviewed by a person.
- Zone is the transmission owner whose deck presented the project. PJM-SYSTEM marks names from PJM's own reliability decks, which span zones.
- A printed customer load is the amount a document states for a request. It says nothing about the substation's capability.