Substation Scout

Greentown substation interconnection queue

0 active projects totaling 0 MW in the MISO queue, plus 2 with terminal status (shown grayed).

2 MISO queue filings name Greentown as the point of interconnection, all in IN.

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
J2251 Not reported 230 200 Solar Withdrawn
J2236 Not reported 230 100 Battery Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with MISO before relying on these figures.