Pilesgrove Solar

PJM queue ID AE2-272

Pilesgrove Solar (AE2-272) is listed in the PJM interconnection queue as a 0.8 MW solar project in Salem County, NJ. The filing names Woodstown as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 31, 2019.

Queue IDAE2-272
Project namePilesgrove Solar
Status (as published)In Service
SubstationWoodstown
Point of interconnectionWoodstown 12 kV
CountySalem
StateNJ
Voltage12 kV
Capacity0.8 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2019-12-31
Source datasetserial

Same substation and county

Woodstown substation: 2 requests in the PJM queue, 1 active totaling 0.8 MW.

Queue IDProjectMWResourceStatus
W2-051Woodstown 69kV7.6SolarWithdrawn

Salem, NJ: 114 requests in the PJM queue, 13 active totaling 906.7 MW.

A substation with the same name is named in PJM transmission planning materials: Woodstown (ACE, 2 mentions).

Same name and state (weaker). Matched on name and state: the utility that presented this substation operates in one state, and every queue filing at a substation of the same name is in that state. No transmission owner is recorded on those filings, so this is a weaker match than one on owner. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW capacity0.8
MFO19.9

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.