Kankakee substation interconnection queue

2 active projects totalling 70 MW in the PJM queue, plus 5 with terminal status (shown greyed).

2active projects
70active MW
7total filed
Queue IDProjectkVMWResourceStatus
AI2-076 Kankakee 138 kV 138 56 Wind Withdrawn
S36 Kankakee Wind Farm 138 35 Wind In Service
S37 Kelly Creek Wind Farm 138 35 Wind In Service
U2-065 Kankakee 138kV 138 32.5 Wind Withdrawn
AI2-014 Kankakee 138 kV 138 20.5 Solar Withdrawn
AD1-150 Kankakee 34.5 kV 34.5 4 Battery Withdrawn
Q13 Kankakee 12kV 12 1.6 Gas Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.