Substation Scout

Braidwood-Davis Creek substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AF1-156 Braidwood-Davis Creek n/r 90 Solar Withdrawn
AE2-153 Braidwood-Davis Creek n/r 35.2 Wind Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.