Kensington substation interconnection queue

1 active project totaling 56 MW in the PJM queue, plus 3 with terminal status (shown grayed).

Target commercial operation dates as filed run from Dec 2023 to Jun 2029 (4 filings). 1 active filing targets a date after November 27, 2026.

Transmission owner as filed: ComEd (3 filings).

1active projects
56active MW
4total filed
Queue IDProjectkVMWResourceStatusTarget COD
AH2-125 Kensington 138 kV 138 100 Battery Withdrawn Dec 2028
AF2-350 Grand Marsh Solar 138 60 Solar Withdrawn Jun 2029
C01-1631 Kensington 138 kV 138 56 Wind Active Jun 2028
AF2-351 Kensington 138 kV 138 8 Battery Withdrawn Dec 2023

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Tracked changes at this substation

1 change to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.

DetectedQueue IDChangeMWStatus was → now
2026-10-19AF2-350Status changen/a Pending Termination → Withdrawn

Other PJM queue substations in Kankakee County, IL

All 42 PJM queue filings in Kankakee County, IL.