Substation Scout

TSS 905 Essex substation interconnection queue

1 active project totaling 150 MW in the PJM queue, plus 1 with terminal status (shown grayed).

2 PJM queue filings name TSS 905 Essex as the point of interconnection, all in Kankakee County, IL.

Target commercial operation dates as filed run from Dec 2028 to Dec 2029 (2 filings). 1 active filing targets a date after November 27, 2026.

Transmission owner as filed: ComEd (2 filings).

1active projects
150active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
C01-1551 TSS 905 Essex 345 kV 345 480 Battery Withdrawn Dec 2029
C01-1567 TSS 905 Essex 345 kV 345 150 Wind Active Dec 2028

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Kankakee County, IL

All 42 PJM queue filings in Kankakee County, IL.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first