TSS 905 Essex substation interconnection queue
1 active project totaling 150 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name TSS 905 Essex as the point of interconnection, all in Kankakee County, IL.
Target commercial operation dates as filed run from Dec 2028 to Dec 2029 (2 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: ComEd (2 filings).
1active projects
150active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-1551 | TSS 905 Essex 345 kV | 345 | 480 | Battery | Withdrawn | Dec 2029 |
| C01-1567 | TSS 905 Essex 345 kV | 345 | 150 | Wind | Active | Dec 2028 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Kankakee County, IL
- Davis Creek: 7 active, 725.4 MW of 15 filed
- Loretto-Wilton & Braidwood-Davis Creek: 3 active, 318 MW of 3 filed
- Kankakee: 2 active, 70 MW of 7 filed
- Kensington: 1 active, 56 MW of 4 filed
- Brokaw-Pontiac Midpoint: 1 active, 32.5 MW of 4 filed
- Wilmington-Davis Creek: none active of 3 filed
- AD1-100 (CIR Increase): none active of 2 filed
- Braidwood-Davis Creek: none active of 2 filed
- Davis Creek - Bloom: none active of 2 filed
- Kensington/Kankakee: none active of 2 filed