Loretto-Wilton & Braidwood-Davis Creek substation interconnection queue
3 active projects totaling 318 MW in the PJM queue.
3 PJM queue filings name Loretto-Wilton & Braidwood-Davis Creek as the point of interconnection, all in Kankakee County, IL.
Target commercial operation dates as filed run from Dec 2027 to Dec 2028 (3 filings). 3 active filings target a date after November 27, 2026.
3active projects
318active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AD1-100 | Heritage Prairie Wind | 345 | 150 | Wind | Under Construction | Dec 2028 |
| AE2-152 | Heritage Prairie Solar | 345 | 90 | Solar | Engineering and Procurement | Dec 2027 |
| AE1-166 | Heritage Prairie Solar | 345 | 78 | Solar | Engineering and Procurement | Dec 2027 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Kankakee County, IL
- Davis Creek: 7 active, 725.4 MW of 15 filed
- TSS 905 Essex: 1 active, 150 MW of 2 filed
- Kankakee: 2 active, 70 MW of 7 filed
- Kensington: 1 active, 56 MW of 4 filed
- Brokaw-Pontiac Midpoint: 1 active, 32.5 MW of 4 filed
- Wilmington-Davis Creek: none active of 3 filed
- AD1-100 (CIR Increase): none active of 2 filed
- Braidwood-Davis Creek: none active of 2 filed
- Davis Creek - Bloom: none active of 2 filed
- Kensington/Kankakee: none active of 2 filed
Site Scanner