Substation Scout

AD1-100 (CIR Increase) substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AI2-462 AD1-100 345kV (CIR Increase) 345 48 Solar Withdrawn
AI2-460 AD1-100 345kV (CIR Increase) 345 36 Solar Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.