Hengst Solar Farm
PJM queue ID W4-046
Hengst Solar Farm (W4-046) is listed in the PJM interconnection queue as a 3.8 MW solar project in Warren County, NJ. The filing names Washington-Mobile Chemical as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of November 28, 2016.
| Queue ID | W4-046 |
|---|---|
| Project name | Hengst Solar Farm |
| Status (as published) | In Service |
| Substation | Washington-Mobile Chemical |
| Point of interconnection | Washington-Mobile Chemical 34.5kV |
| County | Warren |
| State | NJ |
| Voltage | 34.5 kV |
| Capacity | 3.8 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2016-11-28 |
| Source dataset | serial |
Same substation and county
Washington-Mobile Chemical substation: 2 requests in the PJM queue, 1 active totaling 3.8 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| Z2-094 | Washington-Mobile Chemical 34kV | 0 | Battery | Withdrawn |
Warren, NJ: 113 requests in the PJM queue, 24 active totaling 353.9 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 10 |
| MW capacity | 3.8 |
| MFO | 10 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.