Washington-Furnace Brook Tap substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).

2 PJM queue filings name Washington-Furnace Brook Tap as the point of interconnection, all in Warren County, NJ.

Target commercial operation dates as filed run from Feb 2022 to Mar 2022 (2 filings).

Transmission owner as filed: JCPL (2 filings).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AG2-189 Washington-Furnace Brook Tap 34.5 kV 34.5 8.3 Solar Withdrawn Feb 2022
AG2-228 Washington-Furnace Brook Tap 34.5kV 34.5 4.7 Solar Withdrawn Mar 2022

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Warren County, NJ

All 113 PJM queue filings in Warren County, NJ, including 4 more substations.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first