Pittsgrove Solar
PJM queue ID AF1-262
Pittsgrove Solar (AF1-262) is listed in the PJM interconnection queue as a 0.9 MW solar project in Salem County, NJ. The filing names Upper Pittsgrove as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of September 1, 2023.
| Queue ID | AF1-262 |
|---|---|
| Project name | Pittsgrove Solar |
| Status (as published) | In Service |
| Substation | Upper Pittsgrove |
| Point of interconnection | Upper Pittsgrove 12 kV |
| County | Salem |
| State | NJ |
| Voltage | 12 kV |
| Capacity | 0.9 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2023-09-01 |
| Source dataset | serial |
Same substation and county
Upper Pittsgrove substation: 4 requests in the PJM queue, 1 active totaling 0.9 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| X1-016 | Upper Pittsgrove 12kV | 7.6 | Solar | Withdrawn |
| X2-101 | Upper Pittsgrove 138kV | 2.3 | Wind | Withdrawn |
| AI2-203 | Upper Pittsgrove 138 kV | 1 | Solar | Withdrawn |
Salem, NJ: 114 requests in the PJM queue, 13 active totaling 906.7 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 0 |
| MW capacity | 0.9 |
| MFO | 2 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.