Upper Pittsgrove 1 substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
W3-163 Upper Pittsgrove 138kV 1 138 7.6 Solar Withdrawn
V4-023 Upper Pittsgrove Project n/r 6.8 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.