Substation Scout

Steubenville substation interconnection queue

1 active project totalling 20.8 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
20.8active MW
2total filed
Queue IDProjectkVMWResourceStatus
AI2-072 Steubenville 69 kV 69 27.8 Solar Withdrawn
AD2-014 Steubenville Solar 69 20.8 Solar Suspended

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.