Steubenville substation interconnection queue
1 active project totaling 20.8 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Steubenville as the point of interconnection, all in Jefferson County, OH.
Target commercial operation dates as filed run from May 2024 to Dec 2027 (2 filings). 1 active filing targets a date after November 27, 2026.
1active projects
20.8active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AI2-072 | Steubenville 69 kV | 69 | 27.8 | Solar | Withdrawn | May 2024 |
| AD2-014 | Steubenville Solar | 69 | 20.8 | Solar | Suspended | Dec 2027 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Jefferson County, OH
- Sammis - Star: 3 active, 2,575 MW of 3 filed
- Amsterdam: none active of 2 filed
- Sammis: 1 active, 0 MW of 2 filed
- Tidd-Collier: none active of 2 filed
- Tiltonsville: none active of 2 filed
- Tiltonsville-Windsor: none active of 2 filed