Substation Scout

Steubenville substation interconnection queue

1 active project totaling 20.8 MW in the PJM queue, plus 1 with terminal status (shown grayed).

2 PJM queue filings name Steubenville as the point of interconnection, all in Jefferson County, OH.

Target commercial operation dates as filed run from May 2024 to Dec 2027 (2 filings). 1 active filing targets a date after November 27, 2026.

1active projects
20.8active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AI2-072 Steubenville 69 kV 69 27.8 Solar Withdrawn May 2024
AD2-014 Steubenville Solar 69 20.8 Solar Suspended Dec 2027

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Jefferson County, OH

All 16 PJM queue filings in Jefferson County, OH.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first