Tiltonsville-Windsor substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
W1-002 Tiltonsville-Windsor 138kV 138 98 Not reported Withdrawn
W2-008 Tiltonsville-Windsor 138kV 138 0 Not reported Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.