Sammis substation interconnection queue
1 active project totaling 0 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Sammis as the point of interconnection, all in Jefferson County, OH.
Target commercial operation dates as filed run from Dec 1980 to Jan 2030 (2 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: ATSI (1 filing).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| R68 | Sammis 345kV | 345 | 1,940 | Coal | Withdrawn | Dec 1980 |
| C01-2040 | Sammis 345 kV | 345 | 0 | Battery | Active | Jan 2030 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
PJM planning mentions
A substation with the same name is named in PJM transmission planning materials: Sammis (ATSI, 4 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Other PJM queue substations in Jefferson County, OH
- Sammis - Star: 3 active, 2,575 MW of 3 filed
- Steubenville: 1 active, 20.8 MW of 2 filed
- Amsterdam: none active of 2 filed
- Tidd-Collier: none active of 2 filed
- Tiltonsville: none active of 2 filed
- Tiltonsville-Windsor: none active of 2 filed