Stewartsville-Captive Plastics substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Stewartsville-Captive Plastics as the point of interconnection, all in Warren County, NJ.
Target commercial operation dates as filed run from Mar 2012 to Dec 2014 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| W4-014 | Stewartsville II Solar Farm | 34.5 | 6.4 | Solar | Withdrawn | Dec 2014 |
| X1-102 | Stewartsville-Captive Plastics 34.5kV | 34.5 | 3.6 | Solar | Withdrawn | Mar 2012 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Warren County, NJ
- Pequest River: 3 active, 165.9 MW of 5 filed
- Pohatcong: 1 active, 80 MW of 2 filed
- Washington: 3 active, 53.3 MW of 3 filed
- Kittatinny: 1 active, 20 MW of 3 filed
- Phillipsburg: 2 active, 4.1 MW of 8 filed
- Washington-Mobile Chemical: 1 active, 3.8 MW of 2 filed
- Stewartsville: 1 active, 3.6 MW of 2 filed
- Broadway-Stewartsville: 2 active, 3.3 MW of 2 filed
- Gilbert-Morris Park: 1 active, 3.2 MW of 4 filed
- Foul Rift: 1 active, 0.8 MW of 2 filed
- Columbia: 1 active, 0.5 MW of 4 filed
- Belvidere: 1 active, 0 MW of 5 filed
- Mansfield: none active of 4 filed
- Morris Park: none active of 4 filed
- Andover-Kittatinny: none active of 3 filed
- Broadway: none active of 3 filed
- Newburgh: none active of 3 filed
- Flanders: none active of 2 filed
- Franklin #2: none active of 2 filed
- Hackettstown: none active of 2 filed
All 113 PJM queue filings in Warren County, NJ, including 4 more substations.