Stewartsville-Captive Plastics substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).

2 PJM queue filings name Stewartsville-Captive Plastics as the point of interconnection, all in Warren County, NJ.

Target commercial operation dates as filed run from Mar 2012 to Dec 2014 (2 filings).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
W4-014 Stewartsville II Solar Farm 34.5 6.4 Solar Withdrawn Dec 2014
X1-102 Stewartsville-Captive Plastics 34.5kV 34.5 3.6 Solar Withdrawn Mar 2012

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Warren County, NJ

All 113 PJM queue filings in Warren County, NJ, including 4 more substations.