Substation Scout

Philipsburg 34.5 kV

PJM queue ID C01-2134

Philipsburg 34.5 kV (C01-2134) is listed in the PJM interconnection queue as a 20 MW battery project in Clearfield County, PA. The filing names Philipsburg as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of December 31, 2028.

Queue IDC01-2134
Project namePhilipsburg 34.5 kV
Status (as published)Active
SubstationPhilipsburg
Point of interconnectionPhilipsburg 34.5 kV
CountyClearfield
StatePA
Voltage34.5 kV
Capacity20 MW
Resource (as published)Storage
Resource categoryBattery (normalized for filtering)
Target commercial operation2028-12-31
Source datasetcycle

Same substation and county

Philipsburg substation: 6 requests in the PJM queue, 4 active totaling 62 MW.

Queue IDProjectMWResourceStatus
AG1-090Black Moshannon Solar30HybridEP
AG1-377Black Moshannon Solar6SolarEP
AG1-378Black Moshannon Solar6SolarEP
AI2-439Philipsburg 115 kV20HybridWithdrawn
AH2-402Philipsburg 34.5 kV12SolarWithdrawn

Clearfield, PA: 53 requests in the PJM queue, 11 active totaling 840.5 MW.

A substation with the same name is named in PJM transmission planning materials: Philipsburg (PENELEC, 2 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperAM Energy Resources LLC
Transmission ownerPENELEC
Project typeGeneration Interconnection
CycleC01
StagePhase 1
MW energy20.0
MW capacity20.0
MFO20.0
Submitted date4/27/2026
Last updated6/3/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first