Marysville substation interconnection queue
4 active projects totalling 280.8 MW in the PJM queue, plus 5 with terminal status (shown greyed).
4active projects
280.8active MW
9total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AD2-093 | Cadence Solar Energy Center | 345 | 144 | Solar | Partially in Service - Under Construction |
| AF2-223 | Marysville 345 kV | 345 | 120 | Solar | Withdrawn |
| AD2-092 | Cadence Solar II Energy Center | 345 | 72 | Solar | Withdrawn |
| AI2-139 | Marysville 345kV | 345 | 54 | Solar | Withdrawn |
| AD2-096 | Cadence Energy Storage | 345 | 50 | Battery | Suspended |
| C01-1655 | Marysville 345 kV | 345 | 43.4 | Solar | Active |
| C01-1719 | Marysville 345 kV | 345 | 43.4 | Solar | Active |
| AI2-138 | Marysville 345kV | 345 | 42 | Solar | Withdrawn |
| AD2-144 | Marysville 345kV | 345 | 26.4 | Wind | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.