Marysville 345 kV

PJM queue ID C01-1655

Marysville 345 kV (C01-1655) is listed in the PJM interconnection queue as a 43.4 MW solar project in Union County, OH. The filing names Marysville as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of April 24, 2028.

Queue IDC01-1655
Project nameMarysville 345 kV
Status (as published)Active
SubstationMarysville
Point of interconnectionMarysville 345 kV
CountyUnion
StateOH
Voltage345 kV
Capacity43.4 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2028-04-24
Source datasetcycle

Same substation and county

Marysville substation: 9 requests in the PJM queue, 4 active totaling 280.8 MW.

Queue IDProjectMWResourceStatus
AD2-093Cadence Solar Energy Center144SolarPartially in Service - Under Construction
AD2-096Cadence Energy Storage50BatterySuspended
C01-1719Marysville 345 kV43.4SolarActive
AF2-223Marysville 345 kV120SolarWithdrawn
AD2-092Cadence Solar II Energy Center72SolarWithdrawn
AI2-139Marysville 345kV54SolarWithdrawn
AI2-138Marysville 345kV42SolarWithdrawn
AD2-144Marysville 345kV26.4WindWithdrawn

Union, OH: 35 requests in the PJM queue, 6 active totaling 572.2 MW.

A substation with the same name is named in PJM transmission planning materials: Marysville (AEP, 7 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

DeveloperCadence Solar Energy LLC
Transmission ownerAEP
Project typeGeneration Interconnection
CycleC01
StagePhase 1
MW energy0.0
MW capacity43.44
MFO240.0
Submitted date4/27/2026
Last updated6/24/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first