Honda Marysville Tap substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AH1-483 | Honda Marysville Tap 69 kV | 69 | 42 | Battery | Withdrawn |
| AF1-319 | Honda Marysville Tap 69 kV | 69 | 38.4 | Solar | Withdrawn |
| AE2-303 | Cardinal Solar | n/r | 30 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.