Substation Scout

Honda Marysville Tap substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AH1-483 Honda Marysville Tap 69 kV 69 42 Battery Withdrawn
AF1-319 Honda Marysville Tap 69 kV 69 38.4 Solar Withdrawn
AE2-303 Cardinal Solar n/r 30 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.