Substation Scout

Marysville-Tangy substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AG1-218 Marysville-Tangy 345 kV 345 150 Solar Withdrawn
AG2-110 Marysville-Tangy 345 kV 345 20 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.