Bluff Point-Randolph substation interconnection queue
1 active project totalling 42 MW in the PJM queue, plus 2 with terminal status (shown greyed).
1active projects
42active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AE2-219 | Riverstart Solar Park V | 138 | 42 | Solar | Engineering and Procurement |
| AI2-112 | Bluff Point-Randolph 138 kV | 138 | 42 | Solar | Withdrawn |
| AE1-137 | Bluff Point-Randolph | n/r | 38 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.