Substation Scout

Bluff Point-Randolph substation interconnection queue

1 active project totalling 42 MW in the PJM queue, plus 2 with terminal status (shown greyed).

1active projects
42active MW
3total filed
Queue IDProjectkVMWResourceStatus
AE2-219 Riverstart Solar Park V 138 42 Solar Engineering and Procurement
AI2-112 Bluff Point-Randolph 138 kV 138 42 Solar Withdrawn
AE1-137 Bluff Point-Randolph n/r 38 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.