Bluff Point - Randolph substation interconnection queue

2 active projects totaling 80 MW in the PJM queue.

2 PJM queue filings name Bluff Point - Randolph as the point of interconnection, all in Randolph County, IN.

Target commercial operation date as filed: Apr 2029 (2 filings). 2 active filings target a date after November 27, 2026.

Transmission owner as filed: AEP (2 filings).

2active projects
80active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AG2-550 Bluff Point - Randolph 138 kV 138 60 Solar Active Apr 2029
AG2-551 Bluff Point - Randolph 138 kV 138 20 Battery Active Apr 2029

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Same name on other Substation Scout pages

Other sources that print a substation named “Bluff Point - Randolph” in IN. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each.

Other PJM queue substations in Randolph County, IN

All 43 PJM queue filings in Randolph County, IN.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first