Substation Scout

Bluff Point - Randolph substation interconnection queue

2 active projects totalling 80 MW in the PJM queue.

2active projects
80active MW
2total filed
Queue IDProjectkVMWResourceStatus
AG2-550 Bluff Point - Randolph 138 kV 138 60 Solar Active
AG2-551 Bluff Point - Randolph 138 kV 138 20 Battery Active

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.