Losantville substation interconnection queue
6 active projects totaling 410.5 MW in the PJM queue, plus 3 with terminal status (shown grayed).
9 PJM queue filings name Losantville as the point of interconnection, all in Randolph County, IN.
Target commercial operation dates as filed run from Dec 2021 to Dec 2029 (9 filings). 3 active filings target a date after November 27, 2026.
Transmission owner as filed: AEP (2 filings).
6active projects
410.5active MW
9total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-1386 | Losantville 345 kV | 345 | 200 | Battery | Active | Dec 2029 |
| AE2-220 | Riverstart Solar Park II | 345 | 52.5 | Solar | Engineering and Procurement | Nov 2028 |
| AI2-120 | Losantville 345 kV | 345 | 52.5 | Solar | Withdrawn | Oct 2027 |
| AI2-119 | Losantville 345 kV | 345 | 48 | Solar | Withdrawn | Dec 2021 |
| AI2-110 | Losantville 345 kV | 345 | 46 | Solar | Withdrawn | Oct 2023 |
| AG2-401 | Losantville 345 kV | 345 | 44 | Solar | Active | Mar 2027 |
| AC1-174 | Riverstart Solar Park | 345 | 38 | Solar | In Service | Jun 2022 |
| AC1-175 | Riverstart Solar Park | 345 | 38 | Solar | In Service | Jun 2022 |
| AC2-090 | Riverstart Solar Park III | 345 | 38 | Solar | In Service | Dec 2024 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Randolph County, IN
- Desoto - Tanners Creek: 2 active, 301.5 MW of 3 filed
- Marysville: 4 active, 280.8 MW of 9 filed
- Randolph - Hodgin: 1 active, 90 MW of 3 filed
- Bluff Point - Randolph: 2 active, 80 MW of 2 filed
- Bluff Point-Randolph: 1 active, 42 MW of 3 filed
- Payne: 2 active, 30 MW of 4 filed
- Desoto: 2 active, 26 MW of 6 filed
- Desoto-Tanners Creek: 1 active, 26 MW of 5 filed
- Desoto-Tanners Creek #1: 1 active, 26 MW of 3 filed