Losantville substation interconnection queue

6 active projects totaling 410.5 MW in the PJM queue, plus 3 with terminal status (shown grayed).

9 PJM queue filings name Losantville as the point of interconnection, all in Randolph County, IN.

Target commercial operation dates as filed run from Dec 2021 to Dec 2029 (9 filings). 3 active filings target a date after November 27, 2026.

Transmission owner as filed: AEP (2 filings).

6active projects
410.5active MW
9total filed
Queue IDProjectkVMWResourceStatusTarget COD
C01-1386 Losantville 345 kV 345 200 Battery Active Dec 2029
AE2-220 Riverstart Solar Park II 345 52.5 Solar Engineering and Procurement Nov 2028
AI2-120 Losantville 345 kV 345 52.5 Solar Withdrawn Oct 2027
AI2-119 Losantville 345 kV 345 48 Solar Withdrawn Dec 2021
AI2-110 Losantville 345 kV 345 46 Solar Withdrawn Oct 2023
AG2-401 Losantville 345 kV 345 44 Solar Active Mar 2027
AC1-174 Riverstart Solar Park 345 38 Solar In Service Jun 2022
AC1-175 Riverstart Solar Park 345 38 Solar In Service Jun 2022
AC2-090 Riverstart Solar Park III 345 38 Solar In Service Dec 2024

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Randolph County, IN

All 43 PJM queue filings in Randolph County, IN.