Desoto substation interconnection queue

2 active projects totalling 26 MW in the PJM queue, plus 4 with terminal status (shown greyed).

2active projects
26active MW
6total filed
Queue IDProjectkVMWResourceStatus
AF1-298 Desoto 345 kV 345 84 Solar Withdrawn
AF2-173 Esker Solar Park 345 84 Solar Withdrawn
AI2-115 Desoto 345 kV 345 84 Solar Withdrawn
V3-053 Desoto 138kV 138 19.5 Wind Withdrawn
AE1-209 Headwaters Wind Farm III 345 13 Wind Suspended
AE1-210 Headwaters Wind Farm III 345 13 Wind Suspended

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.