Desoto substation interconnection queue
2 active projects totaling 26 MW in the PJM queue, plus 4 with terminal status (shown grayed).
6 PJM queue filings name Desoto as the point of interconnection, all in IN.
Target commercial operation dates as filed run from Dec 2013 to May 2027 (6 filings). 2 active filings target a date after November 27, 2026.
Transmission owner as filed: AEP (1 filing).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AF1-298 | Desoto 345 kV | 345 | 84 | Solar | Withdrawn | Oct 2023 |
| AF2-173 | Esker Solar Park | 345 | 84 | Solar | Withdrawn | Oct 2023 |
| AI2-115 | Desoto 345 kV | 345 | 84 | Solar | Withdrawn | Oct 2026 |
| V3-053 | Desoto 138kV | 138 | 19.5 | Wind | Withdrawn | Dec 2013 |
| AE1-209 | Headwaters Wind Farm III | 345 | 13 | Wind | Suspended | May 2027 |
| AE1-210 | Headwaters Wind Farm III | 345 | 13 | Wind | Suspended | May 2027 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
PJM planning mentions
A substation with the same name is named in PJM transmission planning materials: Desoto (AEP, 5 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Other PJM queue substations in Delaware County, IN
- Delaware-Van Buren: 3 active, 97.8 MW of 4 filed
- Delaware-Royerton: none active of 4 filed
Other PJM queue substations in Randolph County, IN
- Losantville: 6 active, 410.5 MW of 9 filed
- Desoto - Tanners Creek: 2 active, 301.5 MW of 3 filed
- Marysville: 4 active, 280.8 MW of 9 filed
- Randolph - Hodgin: 1 active, 90 MW of 3 filed
- Bluff Point - Randolph: 2 active, 80 MW of 2 filed
- Bluff Point-Randolph: 1 active, 42 MW of 3 filed
- Payne: 2 active, 30 MW of 4 filed
- Desoto-Tanners Creek: 1 active, 26 MW of 5 filed
- Desoto-Tanners Creek #1: 1 active, 26 MW of 3 filed