Desoto substation interconnection queue
2 active projects totalling 26 MW in the PJM queue, plus 4 with terminal status (shown greyed).
2active projects
26active MW
6total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AF1-298 | Desoto 345 kV | 345 | 84 | Solar | Withdrawn |
| AF2-173 | Esker Solar Park | 345 | 84 | Solar | Withdrawn |
| AI2-115 | Desoto 345 kV | 345 | 84 | Solar | Withdrawn |
| V3-053 | Desoto 138kV | 138 | 19.5 | Wind | Withdrawn |
| AE1-209 | Headwaters Wind Farm III | 345 | 13 | Wind | Suspended |
| AE1-210 | Headwaters Wind Farm III | 345 | 13 | Wind | Suspended |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.