Payne substation interconnection queue

2 active projects totaling 30 MW in the PJM queue, plus 2 with terminal status (shown grayed).

Target commercial operation dates as filed run from Nov 2019 to Dec 2025 (4 filings).

Transmission owner as filed: AEP (1 filing).

2active projects
30active MW
4total filed
Queue IDProjectkVMWResourceStatusTarget COD
AC2-181 Payne 69kV 69 19 Solar Withdrawn Nov 2019
AD1-119 Timber Road Solar Park 69 19 Solar In Service Nov 2023
AI2-117 Payne 69 kV 69 12 Solar Withdrawn Jun 2023
AG2-406 Payne 69 kV 69 11 Solar Active Dec 2025

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Randolph County, IN

All 43 PJM queue filings in Randolph County, IN.

Other PJM queue substations in Paulding County, OH

All 28 PJM queue filings in Paulding County, OH.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first