Substation Scout

Payne substation interconnection queue

2 active projects totalling 30 MW in the PJM queue, plus 2 with terminal status (shown greyed).

2active projects
30active MW
4total filed
Queue IDProjectkVMWResourceStatus
AC2-181 Payne 69kV 69 19 Solar Withdrawn
AD1-119 Timber Road Solar Park 69 19 Solar In Service
AI2-117 Payne 69 kV 69 12 Solar Withdrawn
AG2-406 Payne 69 kV 69 11 Solar Active

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.