Substation Scout

Blue Jacket-Kirby substation interconnection queue

1 active project totalling 96.4 MW in the PJM queue, plus 2 with terminal status (shown greyed).

1active projects
96.4active MW
3total filed
Queue IDProjectkVMWResourceStatus
AE1-092 Fountain Point Solar 138 96.4 Solar EP
AF2-216 Blue Jacket-Kirby 138 kV 138 90 Solar Withdrawn
AF1-270 Blue Jacket-Kirby 138 kV 138 50 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.