Blue Jacket-Kirby substation interconnection queue

1 active project totaling 96.4 MW in the PJM queue, plus 2 with terminal status (shown grayed).

3 PJM queue filings name Blue Jacket-Kirby as the point of interconnection, all in OH.

Target commercial operation dates as filed run from Dec 2022 to Apr 2030 (3 filings). 1 active filing targets a date after November 27, 2026.

Transmission owner as filed: Dayton (2 filings).

1active projects
96.4active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
AE1-092 Fountain Point Solar 138 96.4 Solar EP Apr 2030
AF2-216 Blue Jacket-Kirby 138 kV 138 90 Solar Withdrawn Aug 2024
AF1-270 Blue Jacket-Kirby 138 kV 138 50 Solar Withdrawn Dec 2022

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Same name on other Substation Scout pages

Other sources that print a substation named “Blue Jacket-Kirby” in OH. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each.

Other PJM queue substations in Union County, OH

All 35 PJM queue filings in Union County, OH.

Other PJM queue substations in Logan County, OH

All 20 PJM queue filings in Logan County, OH.