Blue Jacket-Kirby substation interconnection queue
1 active project totalling 96.4 MW in the PJM queue, plus 2 with terminal status (shown greyed).
1active projects
96.4active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AE1-092 | Fountain Point Solar | 138 | 96.4 | Solar | EP |
| AF2-216 | Blue Jacket-Kirby 138 kV | 138 | 90 | Solar | Withdrawn |
| AF1-270 | Blue Jacket-Kirby 138 kV | 138 | 50 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.