Blue Jacket-Kirby substation interconnection queue
1 active project totaling 96.4 MW in the PJM queue, plus 2 with terminal status (shown grayed).
3 PJM queue filings name Blue Jacket-Kirby as the point of interconnection, all in OH.
Target commercial operation dates as filed run from Dec 2022 to Apr 2030 (3 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: Dayton (2 filings).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AE1-092 | Fountain Point Solar | 138 | 96.4 | Solar | EP | Apr 2030 |
| AF2-216 | Blue Jacket-Kirby 138 kV | 138 | 90 | Solar | Withdrawn | Aug 2024 |
| AF1-270 | Blue Jacket-Kirby 138 kV | 138 | 50 | Solar | Withdrawn | Dec 2022 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Same name on other Substation Scout pages
Other sources that print a substation named “Blue Jacket-Kirby” in OH. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each.
- Blue Jacket - Kirby: PJM interconnection queue (OH)
Other PJM queue substations in Union County, OH
- Bergen: 12 active, 1,192.4 MW of 22 filed
- Marysville: 4 active, 280.8 MW of 9 filed
- Eagle Road: none active of 3 filed
- Honda Marysville Tap: none active of 3 filed
- Mechanicsburg - Darby: none active of 3 filed
- Marysville-Tangy: none active of 2 filed
Other PJM queue substations in Logan County, OH
- Liberty: 3 active, 185 MW of 5 filed
- Blue Jacket - Kirby: 1 active, 21.3 MW of 3 filed
- Marysville-Sorenson: none active of 5 filed
- Marysville - Sorenson: none active of 4 filed
- Bellefontaine: none active of 2 filed
- Blue Jacket: none active of 2 filed