Eagle Road substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 3 with terminal status (shown grayed).
3 PJM queue filings name Eagle Road as the point of interconnection, all in Union County, OH.
Target commercial operation dates as filed run from Dec 2026 to Dec 2027 (3 filings).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AH2-274 | Eagle Road 138 kV | 138 | 100 | Battery | Withdrawn | Dec 2026 |
| AI1-190 | Eagle Road 138 kV | 138 | 100 | Hybrid | Withdrawn | Dec 2027 |
| AH2-273 | Eagle Road 138 kV | 138 | 90 | Solar | Withdrawn | Dec 2026 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Union County, OH
- Bergen: 12 active, 1,192.4 MW of 22 filed
- Marysville: 4 active, 280.8 MW of 9 filed
- Blue Jacket-Kirby: 1 active, 96.4 MW of 3 filed
- Honda Marysville Tap: none active of 3 filed
- Mechanicsburg - Darby: none active of 3 filed
- Marysville-Tangy: none active of 2 filed