Keystone substation interconnection queue
4 active projects totalling 86 MW in the PJM queue, plus 8 with terminal status (shown greyed).
4active projects
86active MW
12total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| B10 | Keystone 500kV | 500 | 600 | Gas | Withdrawn |
| D23 | Keystone 500kV | 500 | 500 | Gas | Withdrawn |
| B07 | Keystone 500kV | 500 | 300 | Gas | Withdrawn |
| AG1-549 | Keystone 230 kV | 230 | 85 | Hybrid | Withdrawn |
| G51 | Keystone 500kV | 500 | 75 | Gas | Withdrawn |
| V3-015 | Wells County Wind Farm | 345 | 39 | Wind | Withdrawn |
| V4-021 | Keystone 345kV | 345 | 39 | Wind | Withdrawn |
| Q10 | Montpelier | 345 | 27 | Gas | In Service |
| T109 | Keystone Generating Station | 500 | 20 | Coal | In Service |
| T110 | Keystone Generating Station | 500 | 20 | Coal | In Service |
| S13 | Montpelier | 345 | 19 | Gas | In Service |
| Y2-112 | Keystone 345kV | 345 | 0 | Battery | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.