Johnstown substation interconnection queue
1 active project totaling 200 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Johnstown as the point of interconnection, all in PA.
Target commercial operation dates as filed run from Dec 2005 to Dec 2030 (2 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: PENELEC (1 filing).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| G31 | Johnstown 230kV | 230 | 610 | Gas | Withdrawn | Dec 2005 |
| C01-2043 | Johnstown 230 kV | 230 | 200 | Battery | Active | Dec 2030 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
PJM planning mentions
A substation with the same name is named in PJM transmission planning materials: Johnstown (PENELEC, 5 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Other PJM queue substations in Indiana County, PA
- Homer City: 2 active, 2,516 MW of 4 filed
- South Bend: 8 active, 1,446.8 MW of 12 filed
- Wayne-Homer City: 1 active, 250 MW of 2 filed
- Keystone: 4 active, 86 MW of 12 filed
- Shelocta: none active of 3 filed
- Blairsville East: none active of 2 filed
- Keystone-Conemaugh: none active of 2 filed
- Seward-Glory: none active of 2 filed
Other PJM queue substations in Cambria County, PA
- Hunterstown-Conemaugh: 2 active, 1,100 MW of 4 filed
- Cambria Slope: 1 active, 200 MW of 6 filed
- Bear Rock-Johnstown: 2 active, 90 MW of 2 filed
- Johnstown-Altoona: 2 active, 26 MW of 3 filed
- Glory: 1 active, 6 MW of 2 filed
- St. Benedict-Patton: 2 active, 5.4 MW of 2 filed
- Krayn: none active of 3 filed