Johnstown substation interconnection queue

1 active project totalling 200 MW in the PJM queue, plus 1 with terminal status (shown greyed).

1active projects
200active MW
2total filed
Queue IDProjectkVMWResourceStatus
G31 Johnstown 230kV 230 610 Gas Withdrawn
C01-2043 Johnstown 230 kV 230 200 Battery Active

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.