Keystone-Conemaugh substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AB1-003 | Keystone-Conemaugh 500kV | 500 | 1,474 | Gas | Withdrawn |
| F05 | Keystone-Conemaugh 500kV | 500 | 646 | Gas | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.