Keystone-Conemaugh substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Keystone-Conemaugh as the point of interconnection, all in PA.
Target commercial operation date as filed: Dec 2019 (1 filing).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AB1-003 | Keystone-Conemaugh 500kV | 500 | 1,474 | Gas | Withdrawn | Dec 2019 |
| F05 | Keystone-Conemaugh 500kV | 500 | 646 | Gas | Withdrawn | n/r |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Indiana County, PA
- Homer City: 2 active, 2,516 MW of 4 filed
- South Bend: 8 active, 1,446.8 MW of 12 filed
- Wayne-Homer City: 1 active, 250 MW of 2 filed
- Johnstown: 1 active, 200 MW of 2 filed
- Keystone: 4 active, 86 MW of 12 filed
- Shelocta: none active of 3 filed
- Blairsville East: none active of 2 filed
- Seward-Glory: none active of 2 filed
Other PJM queue substations in Armstrong County, PA
- South Bend: 8 active, 1,446.8 MW of 12 filed
- Keystone: 4 active, 86 MW of 12 filed
- Timblin: 1 active, 20 MW of 3 filed
- Clementine-Clementine Jct.: none active of 2 filed
- Kittanning-Rural Valley: none active of 2 filed
- Piney - Timblin: none active of 2 filed