Timblin substation interconnection queue
1 active project totalling 20 MW in the PJM queue, plus 2 with terminal status (shown greyed).
1active projects
20active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AD1-154 | Timblin 34.5 kV | 34.5 | 20 | Gas | Withdrawn |
| C01-1845 | Timblin 34.5 kV | 34.5 | 20 | Gas | Active |
| AF1-240 | AR-PIERCE | 34.5 | 11 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.