Adams substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 5 with terminal status (shown greyed).

0active projects
0active MW
5total filed
Queue IDProjectkVMWResourceStatus
AG1-225 Adams 138 kV 138 207 Solar Withdrawn
AH2-237 Adams 138 kV 138 75 Solar Withdrawn
AH2-284 Adams 138 kV 138 49.9 Hybrid Withdrawn
AB2-085 Stone Branch Solar 138 33.9 Solar Withdrawn
AG2-503 Adams 138 kV 138 5 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.