Blairsville East substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Blairsville East as the point of interconnection, all in Indiana County, PA.
Target commercial operation dates as filed run from Dec 2022 to Oct 2030 (2 filings).
Transmission owner as filed: PENELEC (1 filing).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-2156 | Blairsville East 138 kV | 138 | 50 | Battery | Withdrawn | Oct 2030 |
| AG1-295 | Blairsville East 23 kV | 23 | 4.9 | Solar | Withdrawn | Dec 2022 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
PJM planning mentions
A substation with the same name is named in PJM transmission planning materials: Blairsville East (PENELEC, 3 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Other PJM queue substations in Indiana County, PA
- Homer City: 2 active, 2,516 MW of 4 filed
- South Bend: 8 active, 1,446.8 MW of 12 filed
- Wayne-Homer City: 1 active, 250 MW of 2 filed
- Johnstown: 1 active, 200 MW of 2 filed
- Keystone: 4 active, 86 MW of 12 filed
- Shelocta: none active of 3 filed
- Keystone-Conemaugh: none active of 2 filed
- Seward-Glory: none active of 2 filed