Sorenson-Desoto substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AF1-118 | Paddlefish Solar | 345 | 268.9 | Hybrid | Withdrawn |
| AF1-148 | Sorenson-Desoto 345 kV | 345 | 95.4 | Hybrid | Withdrawn |
| AG1-375 | Blackford County Solar | 345 | 60 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.