Sorenson-Desoto substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 3 with terminal status (shown grayed).
3 PJM queue filings name Sorenson-Desoto as the point of interconnection, all in IN.
Target commercial operation dates as filed run from Apr 2023 to Feb 2029 (3 filings).
Transmission owner as filed: AEP (1 filing).
0active projects
0active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AF1-118 | Paddlefish Solar | 345 | 268.9 | Hybrid | Withdrawn | Feb 2029 |
| AF1-148 | Sorenson-Desoto 345 kV | 345 | 95.4 | Hybrid | Withdrawn | Apr 2023 |
| AG1-375 | Blackford County Solar | 345 | 60 | Solar | Withdrawn | Oct 2024 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Wells County, IN
Other PJM queue substations in Blackford County, IN
- Keystone-Desoto: 5 active, 329.2 MW of 7 filed
- Jay: 5 active, 200 MW of 12 filed
- Desoto - Keystone: 2 active, 141.4 MW of 3 filed
- Jay-Desoto: none active of 2 filed