Sorenson-Desoto substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 3 with terminal status (shown grayed).

3 PJM queue filings name Sorenson-Desoto as the point of interconnection, all in IN.

Target commercial operation dates as filed run from Apr 2023 to Feb 2029 (3 filings).

Transmission owner as filed: AEP (1 filing).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
AF1-118 Paddlefish Solar 345 268.9 Hybrid Withdrawn Feb 2029
AF1-148 Sorenson-Desoto 345 kV 345 95.4 Hybrid Withdrawn Apr 2023
AG1-375 Blackford County Solar 345 60 Solar Withdrawn Oct 2024

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Wells County, IN

All 10 PJM queue filings in Wells County, IN.

Other PJM queue substations in Blackford County, IN

All 18 PJM queue filings in Blackford County, IN.