Substation Scout

Sorenson-Desoto substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 3 with terminal status (shown greyed).

0active projects
0active MW
3total filed
Queue IDProjectkVMWResourceStatus
AF1-118 Paddlefish Solar 345 268.9 Hybrid Withdrawn
AF1-148 Sorenson-Desoto 345 kV 345 95.4 Hybrid Withdrawn
AG1-375 Blackford County Solar 345 60 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.