Kingsland substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 6 with terminal status (shown grayed).

Target commercial operation dates as filed run from Nov 2019 to Apr 2025 (4 filings).

0active projects
0active MW
6total filed
Queue IDProjectkVMWResourceStatusTarget COD
AG2-638 Kingsland 69 kV 69 60 Solar Withdrawn Apr 2025
AH1-433 Kingsland 69 kV 69 40 Battery Withdrawn Apr 2025
AE1-126 Kingsland 26 kV 26 8.3 Solar Withdrawn Nov 2019
AF1-110 Kingsland 26 kV 26 2 Solar Withdrawn n/r
AF1-111 Kingsland 26 kV 26 2 Solar Withdrawn n/r
AG1-200 Kingsland 13 kV 13 1.7 Solar Withdrawn Dec 2021

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Wells County, IN

All 10 PJM queue filings in Wells County, IN.

Other PJM queue substations in Bergen County, NJ

All 39 PJM queue filings in Bergen County, NJ.