Armstrong, PA interconnection queue
11 active projects totalling 1,202.6 MW in the PJM queue, plus 24 with terminal status (shown greyed).
11active projects
1,202.6active MW
35total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AC2-118 | Cabot-Keystone 500kV | 500 | 1,100 | Gas | Withdrawn |
| F05 | Keystone-Conemaugh 500kV | 500 | 646 | Gas | Withdrawn |
| B10 | Keystone 500kV | 500 | 600 | Gas | Withdrawn |
| B12_W01 | South Bend CT1 - CT4 | 500 | 600 | Gas | In Service |
| AD2-114 | South Bend Generating Station | 500 | 400 | Gas | Withdrawn |
| U4-032 | South Bend 500kV | 500 | 400 | Gas | Withdrawn |
| C01-1750 | South Bend 500 kV | 500 | 327.6 | Gas | Active |
| B07 | Keystone 500kV | 500 | 300 | Gas | Withdrawn |
| AH1-566 | Armstrong Battery Storage | 500 | 250 | Battery | Withdrawn |
| G30_W53 | South Bend CT1 - CT4 | 500 | 104 | Gas | In Service |
| AI1-162 | Saltsburg-Vandergrift 138 kV | 138 | 100 | Battery | Withdrawn |
| AG1-549 | Keystone 230 kV | 230 | 85 | Hybrid | Withdrawn |
| G51 | Keystone 500kV | 500 | 75 | Gas | Withdrawn |
| AD1-099 | South Bend Generating Station | 500 | 70 | Gas | In Service |
| AD2-113 | South Bend Generating Station | 500 | 60.6 | Gas | In Service |
| Y3-112 | Butler-Shanor Manor 138kV | 138 | 43 | Not reported | Withdrawn |
| Y2-052 | South Bend 500kV | 500 | 34.6 | Gas | Withdrawn |
| AH2-129 | Piney - Timblin 115 kV | 115 | 23.8 | Solar | Withdrawn |
| AG2-386 | Kittanning-Rural Valley 25 kV | 25 | 18 | Solar | Withdrawn |
| AF1-240 | AR-PIERCE | 34.5 | 11 | Solar | Withdrawn |
| AH1-372 | Piney - Timblin 115 kV | 115 | 10.9 | Solar | Withdrawn |
| Z1-055 | South Bend Generating Station | 500 | 10 | Gas | In Service |
| AG2-654 | Craigsville - Leards Crossing 12 kV | 12 | 8.8 | Solar | Withdrawn |
| AI2-321 | Clementine-Clementine Jct. 25 kV | 25 | 8.6 | Solar | Withdrawn |
| AH1-452 | McVille Solar | 25 | 8.4 | Solar | Active |
| AH1-332 | West Hills - Craigsville Junction 25 kV | 25 | 8 | Solar | Withdrawn |
| AH2-163 | Kittanning - Rural Valley 25 kV | 25 | 8 | Solar | Withdrawn |
| AI1-143 | Bell Township - Vandergrift 25 kV | 25 | 8 | Solar | Withdrawn |
| AI2-323 | Kittanning-Rural Valley 25 kV | 25 | 7.6 | Solar | Withdrawn |
| AF2-314 | Ponytail Solar | 25 | 6 | Solar | Withdrawn |
| T155 | Mahoning Creek Dam Hydro Project | 25 | 6 | Hydro | In Service |
| Z1-056 | South Bend Generating Station | 500 | 6 | Gas | In Service |
| Z1-088 | Allegheny River Lock & Dam # 5 | n/r | 5 | Hydro | In Service |
| Z1-089 | Allegheny River Lock & Dam #6 | 138 | 5 | Hydro | In Service |
| AI2-324 | Cowansville Junction – Long Run Tap 25 kV | 25 | 3.7 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.