Homer City substation interconnection queue

2 active projects totaling 2,516 MW in the PJM queue, plus 2 with terminal status (shown grayed).

4 PJM queue filings name Homer City as the point of interconnection, all in Indiana County, PA.

Target commercial operation dates as filed run from Dec 2004 to Nov 2029 (3 filings). 2 active filings target a date after November 27, 2026.

Transmission owner as filed: PENELEC (2 filings).

2active projects
2,516active MW
4total filed
Queue IDProjectkVMWResourceStatusTarget COD
C01-1097 Homer City 345 kV 345 1,736 Gas Active Nov 2029
C01-1250 Homer City 230 kV 230 780 Gas Active Nov 2029
G43 Homer City n/r 600 Gas Withdrawn n/r
G09 Homer City n/r 547.5 Gas Withdrawn Dec 2004

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

PJM planning mentions

A substation with the same name is named in PJM transmission planning materials: Homer City (PENELEC, 3 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Other PJM queue substations in Indiana County, PA

All 33 PJM queue filings in Indiana County, PA.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first