Wells, IN interconnection queue
2 active projects totalling 46 MW in the PJM queue, plus 8 with terminal status (shown greyed).
2active projects
46active MW
10total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AF1-118 | Paddlefish Solar | 345 | 268.9 | Hybrid | Withdrawn |
| AF1-148 | Sorenson-Desoto 345 kV | 345 | 95.4 | Hybrid | Withdrawn |
| AH2-237 | Adams 138 kV | 138 | 75 | Solar | Withdrawn |
| AG2-638 | Kingsland 69 kV | 69 | 60 | Solar | Withdrawn |
| AH1-433 | Kingsland 69 kV | 69 | 40 | Battery | Withdrawn |
| V3-015 | Wells County Wind Farm | 345 | 39 | Wind | Withdrawn |
| V4-021 | Keystone 345kV | 345 | 39 | Wind | Withdrawn |
| Q10 | Montpelier | 345 | 27 | Gas | In Service |
| S13 | Montpelier | 345 | 19 | Gas | In Service |
| Y2-112 | Keystone 345kV | 345 | 0 | Battery | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.