Substation Scout

Wells, IN interconnection queue

2 active projects totalling 46 MW in the PJM queue, plus 8 with terminal status (shown greyed).

2active projects
46active MW
10total filed
Queue IDProjectkVMWResourceStatus
AF1-118 Paddlefish Solar 345 268.9 Hybrid Withdrawn
AF1-148 Sorenson-Desoto 345 kV 345 95.4 Hybrid Withdrawn
AH2-237 Adams 138 kV 138 75 Solar Withdrawn
AG2-638 Kingsland 69 kV 69 60 Solar Withdrawn
AH1-433 Kingsland 69 kV 69 40 Battery Withdrawn
V3-015 Wells County Wind Farm 345 39 Wind Withdrawn
V4-021 Keystone 345kV 345 39 Wind Withdrawn
Q10 Montpelier 345 27 Gas In Service
S13 Montpelier 345 19 Gas In Service
Y2-112 Keystone 345kV 345 0 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.