Clementine-Clementine Jct. substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).

2 PJM queue filings name Clementine-Clementine Jct. as the point of interconnection, all in Armstrong County, PA.

Target commercial operation dates as filed run from Jun 2025 to Jun 2027 (2 filings).

Transmission owner as filed: APS (1 filing).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
AI2-321 Clementine-Clementine Jct. 25 kV 25 8.6 Solar Withdrawn Jun 2025
AH1-452 McVille Solar 25 8.4 Solar Withdrawn Jun 2027

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Tracked changes at this substation

1 change to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.

DetectedQueue IDChangeMWStatus was → now
2026-10-05AH1-452Terminal status8.4 Active → Withdrawn

Other PJM queue substations in Armstrong County, PA

All 35 PJM queue filings in Armstrong County, PA.