Clementine-Clementine Jct. substation interconnection queue
1 active project totalling 8.4 MW in the PJM queue, plus 1 with terminal status (shown greyed).
1active projects
8.4active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AI2-321 | Clementine-Clementine Jct. 25 kV | 25 | 8.6 | Solar | Withdrawn |
| AH1-452 | McVille Solar | 25 | 8.4 | Solar | Active |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.