Clementine-Clementine Jct. substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Clementine-Clementine Jct. as the point of interconnection, all in Armstrong County, PA.
Target commercial operation dates as filed run from Jun 2025 to Jun 2027 (2 filings).
Transmission owner as filed: APS (1 filing).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AI2-321 | Clementine-Clementine Jct. 25 kV | 25 | 8.6 | Solar | Withdrawn | Jun 2025 |
| AH1-452 | McVille Solar | 25 | 8.4 | Solar | Withdrawn | Jun 2027 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Tracked changes at this substation
1 change to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.
| Detected | Queue ID | Change | MW | Status was → now |
|---|---|---|---|---|
| 2026-10-05 | AH1-452 | Terminal status | 8.4 | Active → Withdrawn |
Other PJM queue substations in Armstrong County, PA
- South Bend: 8 active, 1,446.8 MW of 12 filed
- Keystone: 4 active, 86 MW of 12 filed
- Timblin: 1 active, 20 MW of 3 filed
- Keystone-Conemaugh: none active of 2 filed
- Kittanning-Rural Valley: none active of 2 filed
- Piney - Timblin: none active of 2 filed