South Bend substation interconnection queue
8 active projects totaling 1,446.8 MW in the PJM queue, plus 4 with terminal status (shown grayed).
12 PJM queue filings name South Bend as the point of interconnection, all in PA.
Target commercial operation dates as filed run from Mar 2002 to May 2031 (12 filings). 2 active filings target a date after November 27, 2026.
Transmission owner as filed: APS (3 filings).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| B12_W01 | South Bend CT1 - CT4 | 500 | 600 | Gas | In Service | Mar 2002 |
| AD2-114 | South Bend Generating Station | 500 | 400 | Gas | Withdrawn | Jun 2023 |
| U4-032 | South Bend 500kV | 500 | 400 | Gas | Withdrawn | Apr 2013 |
| C01-1750 | South Bend 500 kV | 500 | 327.6 | Gas | Active | May 2031 |
| AH1-734 | South Bend 500 kV | 500 | 268.6 | Gas | Active | May 2030 |
| AH1-566 | Armstrong Battery Storage | 500 | 250 | Battery | Withdrawn | Jun 2025 |
| G30_W53 | South Bend CT1 - CT4 | 500 | 104 | Gas | In Service | Jun 2003 |
| AD1-099 | South Bend Generating Station | 500 | 70 | Gas | In Service | Sep 2019 |
| AD2-113 | South Bend Generating Station | 500 | 60.6 | Gas | In Service | Jun 2023 |
| Y2-052 | South Bend 500kV | 500 | 34.6 | Gas | Withdrawn | Jun 2016 |
| Z1-055 | South Bend Generating Station | 500 | 10 | Gas | In Service | Jun 2016 |
| Z1-056 | South Bend Generating Station | 500 | 6 | Gas | In Service | Jun 2016 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Same name on other Substation Scout pages
Other sources that print a substation named “South Bend” in PA. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each. Where a PJM planning record prints no state, the match is by name within the states the utility zone serves, which is weaker.
- South Bend: Expansion Tracker, PJM planning: PJM system-wide state not printed
Other PJM queue substations in Armstrong County, PA
- Keystone: 4 active, 86 MW of 12 filed
- Timblin: 1 active, 20 MW of 3 filed
- Clementine-Clementine Jct.: none active of 2 filed
- Keystone-Conemaugh: none active of 2 filed
- Kittanning-Rural Valley: none active of 2 filed
- Piney - Timblin: none active of 2 filed
Other PJM queue substations in Indiana County, PA
- Homer City: 2 active, 2,516 MW of 4 filed
- Wayne-Homer City: 1 active, 250 MW of 2 filed
- Johnstown: 1 active, 200 MW of 2 filed
- Keystone: 4 active, 86 MW of 12 filed
- Shelocta: none active of 3 filed
- Blairsville East: none active of 2 filed
- Keystone-Conemaugh: none active of 2 filed
- Seward-Glory: none active of 2 filed